Showing posts with label Bridge Building challenge. Show all posts
Showing posts with label Bridge Building challenge. Show all posts

Friday, 28 February 2020

Building and Testing - Bridges

For our Building and Testing science unit the students were challenged to design a "bridge" with only 50 straws and masking tape.  The bridge was then tested for strength and stability!

This one held 100+ marbles

This one held 100+ marbles

This one held 100+ marbles




 

Monday, 21 May 2018

Bridge Building Challenge

A few weeks ago during science, the students were challenged to work in small groups and build a bridge.  They could only use 50 straws and masking tape to build their bridge. The bridge had to span 20 centimeters and be wide enough to hold a hot wheels car.  We tested the strength of each bridge by placing up to 50 marble weights on one at a time until the bridge collapsed.

Here are the bridges on display in library showcase.


A few pictures of the building in action.




A few pictures of the final products!





Sunday, 14 May 2017

Bridge Building & Testing

Last week the students were challenged with a bridge building activity.  The challenge was to work in small groups to construct a sturdy, strong bridge that would span 15 centimeters!  Each group was given 50 straws and a roll of tape.  When the groups finished their construction we tested the strength of the bridge with marbles.  The strongest bridges held 100 marbles, while the weakest held less than 10.














Sunday, 8 May 2016

Building Bridges

Friday, May 6th

Today we started part one of a bridge building challenge.  Students were placed into groups and were given 50 straws and some tape.  Their challenge is to build a strong, stable bridge that can span 15 cms.  They can not use any other supplies.  At the end of the challenge, we will test the strength of each bridge.

Part One:  Planning and Construction